All Collections
Settings
Plan
How can I determine a minimum and maximum work duration?
How can I determine a minimum and maximum work duration?
Wouter Huybrighs avatar
Written by Wouter Huybrighs
Updated over a week ago
  • Click on ‘Plan’ in the left side bar.

  • Scroll down the page to 'Shifts'.

  • Enter a minimum and maximum length next to 'Work duration between'.

  • Scroll down and click on 'Update settings' to save your changes.

Did this answer your question?